Karachi Industrial Park (KIP) as Special Economic Zone (SEZ) under CPEC

Location

Port Qasim, Karachi

Sector

Industrial

Total Cost

PKR 26B

Area

1,500 Acres

Year

2027

Client

Pakistan Industrial Development Corporation (Pvt.) Ltd., Ministry of Industries & Production

Project Background

Pakistan Industrial Development Corporation (PIDC) intends to setup an international standard Special Economic Zone in Karachi on an initial area of 1500 Acres, equipped with all amenities / utilities at the doorstep for the investors in a plug-and-play environment. The utilities will include all wet and dry utilities required for an industrial estate alongside its own 132 KV Grid Station. The proposed location is near Port Qasim at the land of Pakistan Steel Mills. The project aims to encourage foreign and domestic investors with diversified needs to setup industrial units, preferably oriented towards exports and imports substitution.

Services

EA’s scope of services included complete design and engineering solutions for bridge structure and infrastructure development. This covered feasibility analysis, structural design, geotechnical investigations, and construction supervision. Specialized expertise was applied in steel arch design, load testing, and quality assurance to ensure durability and safety. EA also coordinated with international consultants to align technical standards and project execution with global best practices.