EQDR Roads of Balakot to Naran Section

Location

Balakot & Naran

Sector

Roads & Highways

Total Cost

PKR 1.6B

Year

2011

Client

National Highway Authority

Project Background

The project is a rehabilitation of National Highway N-15, Basian-Balakot-Naran Section, one of the badly damaged four major roads by the earthquake of October 2005, has been undertaken by NHA under contract -16, 65 km, with financial assistance from the World Bank, is included in the rehabilitation / reconstruction work. The first phase starts from km 37+600 and ends at km 81+600 (Balakot to Mahandri 44 km length). The road lies to the east of the river “Kunhar” in a steep side valley. The damage is extensive and comprises slips, slides and longitudinal and transverse cracks. The rehabilitation stategy includes widening the vROW from 13 m to 20 m improving the alignment reconstruction of retaining wall, breast wall and reconstruction of Bridges, Culverts and Causeways.

Services

EA’s scope of services included complete design and engineering solutions for bridge structure and infrastructure development. This covered feasibility analysis, structural design, geotechnical investigations, and construction supervision. Specialized expertise was applied in steel arch design, load testing, and quality assurance to ensure durability and safety. EA also coordinated with international consultants to align technical standards and project execution with global best practices.