Quality Control Services for Peshawar-Karachi Motorway, Sukkur-Multan Section

Location

Multan

Sector

Roads & Highways

Total Cost

PKR 576.8B

Year

2020

Client

China State Construction Engineering Corporation Ltd. and National Highway Authority

Project Background

The Government of Pakistan through National Highway Authority (NHA) has planned to construct 392 Km. long 6- lane Motorway between Multan to Sukkur as a part of Peshawar -Karachi Motorway. It also comprises construction of all allied structures (culverts, bridges / interchanges) and construction of 2-lane service roads on the either side of the Motorway. The proposed section of Motorway shall be further divided into seven sub-sections approx.55~60 Km. each to facilitate its construction. The contract of motorway project has been signed between CSCEC and NHA. CSCEC has become the EPC contractor of this project. EA has been hired as a in house team of consultant of this project by CSCEC, in charge of the quality assurance service and quality control service of section I (stake mark from K380+000 to K435+000), and section III (stake mark from K491+000 to K550+000), and section VII (stake mark from K716+000 to K772+200).

Services

EA’s scope of services included complete design and engineering solutions for bridge structure and infrastructure development. This covered feasibility analysis, structural design, geotechnical investigations, and construction supervision. Specialized expertise was applied in steel arch design, load testing, and quality assurance to ensure durability and safety. EA also coordinated with international consultants to align technical standards and project execution with global best practices.