Location
Karachi
Sector
Roads & Highways
Total Cost
PKR 141B
Year
2028
Client
TransKarachi
Project Background
The project starts from Numaish Chowrangi, near Mazar-e-Quaid interfacing with the BRT Green Line, where it goes through New M.A Jinnah Road, Jail Chowrangi, Askari Park, Civic Center, University Road, Safoora Chowk, Malir Cantt Gate No. 6, and ends at Model Colony near the Karachi International Airport. The Red Line Corridor consists of 23 bus stations, 17 pedestrian bridges, 2 bus depots, 5 flyover bridges, 5 underpasses, 8 elevated U-turns, and 1 elevated rotary. The Red Line integrates within the Green Line and Blue Line BRT Corridors at the Numaish Underpass. The overall length of the BRT Red Line is 27.6 km.
Services
- Project Management
- Data Validation
- Review of Studies, Surveys and Reports
- Updating of RP & LARP
- Design Review and Re-Design
- BOQs, Contract Documents and Technical Specifications
- Construction Supervision