Kohat-Tunnel-Approach-Roads

Kohat Tunnel & Approach Roads

Kohat-Tunnel-Approach-Roads

Location

Kohat, Khyber Pakhtunkhwa

Sector

Bridges, Underpasses & Tunnels

Total Cost

PKR 5.6B

Year

2003

Client

National Highway Authority

Project Background

Indus Highway taking off from Peshawar, passes over a hill rising to a height of 900 meters. The distance between the towns of Peshawar and Kohat, over the existing hill route is nearly 65 km. The National Highway Authority carried out the project to build a tunnel through the hill range with a view to reducing the distance. The length of the tunnel is 1.885 km. The tunnel will reduce the distance between Peshawar and Kohat by 20 km. Also, the travel time will be much reduced as the speed will increase from the present 40 km per hour to 70 km per hour. In addition travel over the steep and dangerous hill route, that causes many accident, will be avoided. Construction of the project has recently completed.

Services

EA’s scope of services included complete design and engineering solutions for bridge structure and infrastructure development. This covered feasibility analysis, structural design, geotechnical investigations, and construction supervision. Specialized expertise was applied in steel arch design, load testing, and quality assurance to ensure durability and safety. EA also coordinated with international consultants to align technical standards and project execution with global best practices.