Location
Hyderabad, Mirpurkhas & Shaheed Benazirabad Divisions
Sector
Urban Planning
Area
263,000 Acres
Total Cost
PKR 137B
Year
2022
Client
Directorate of Urban Policy & Strategic Planning, P&D Department, Government of Sindh
Project Background
The assignment involved preparation of Development Master Plans for Fourteen (14) District Headquarter Towns of Hyderabad, Mirpurkhas and Shaheed Benazirabad Divisions of Sindh. These DHQ Towns includes Thatta, Jamshoro, Sujawal, Badin, Tando Allahyar, Tando Muhammad Khan, Matiari, Dadu, Mirpurkhas, Mithi, Umerkot, Nawabshah, Naushahro Feroze and Sanghar. The project covered approximately 263,000 acres with an estimated population of 3.5 million. It aimed to guide planned urban growth through integrated spatial planning, infrastructure development, transportation planning, environmental management, and economic analysis. The master plans provided a strategic framework for sustainable urban development, improved service delivery, and balanced regional growth over the 20-year planning horizon from 2017 to 2037.
Services
EA’s scope of services included complete design and engineering solutions for bridge structure and infrastructure development. This covered feasibility analysis, structural design, geotechnical investigations, and construction supervision. Specialized expertise was applied in steel arch design, load testing, and quality assurance to ensure durability and safety. EA also coordinated with international consultants to align technical standards and project execution with global best practices.
- Inception and Situation Analysis Reports
- Digital Base Map and Explanatory Report
- SWOT Analysis and Future Vision Report
- Strategic and Economic Development Plans
- Immediate Action Plan and Priority Projects
- Disaster Management Plan
- Climate Change, Resilience & Adaptability Plan Sustainable Development Goals (SDGs)
- Implementation Plan Report
- Final Strategic Development Plan Report









