Rehabilitation of Limpopo Railway Line

Location

Limpopo

Sector

Overseas

Total Cost

USD 350M

Total Cost

PKR 21.3B

Year

2005

Client

USAID Mission to Mozambique

Project Background

The Limpopo Rail Line runs from Maputo (capital and port city of Mozambique) to the border with Zimbabwe and serves as a major trade link between the neighbor countries. The approximately 275 Km long rail line was severely damaged during floods in the year 1998 and 1999. Emergency and temporary repairs had kept the rail line operational but at below desired operational standards. Work for repair and rehabilitation of the impaired rail line was commissioned by the USAID, design work was awarded to Parsons Global Services Limited and its sister company De Leuw Cather Overseas Limited, Dubai who outsourced the entire component of design work to the then Engineering Associates, now EA Consulting Pvt. Ltd.

Services

EA’s scope of services included complete design and engineering solutions for bridge structure and infrastructure development. This covered feasibility analysis, structural design, geotechnical investigations, and construction supervision. Specialized expertise was applied in steel arch design, load testing, and quality assurance to ensure durability and safety. EA also coordinated with international consultants to align technical standards and project execution with global best practices.