Location
Gwadar
Sector
Ports & Harbors
Total Cost
PKR 1.3B
Year
2018
Client
Gwadar Development Authority (GDA)
Project Background
The main purpose of this project is to provide New Fish harbor at west bay Gwadar on EPC basis to facilitate the fisherman which are going to be displaced from the existing fish harbor cum mini port i.e. East Bay. Due to CPEC need, the east bay harbor of Gwadar will be developed in to the commercial port and free zone area based on the Gwadar Master plan. This project will support Gwadar Fish Harbor and Fishermen Boat Making Industry on West Bay Gwadar.
Services
- Topographic & Bathymetric Survey
- Deep Soil & Material Investigation
- Oceanographic Study
- Detailed Structure Design
- Feasibility Study
- Geometric Design
- EIA Study
- Tender Documents
- Comprehensive Final Report
- PC-I & Cost Estimates