Location
Gwadar
Sector
Ports & Harbors
Total Cost
PKR 1.45B
Area
500,000 sq.m.
Year
2024
Client
Engineering Section, Gwadar Development Authority, Government of Balochistan
Project Background
The main purpose of this project was to provide an alternate mini port to facilitate the local fisherman which were displaced from the existing fish harbor cum mini port in East Bay. Due to CPEC need, the east bay harbor of Gwadar will be developed into the commercial port and free zone area based on the Gwadar Master plan. Therefore, GDA entrusted EA to prepare relevant studies report for the project along with the design and construction supervision of Break Water / Groyne Wall with Auction Hall, Boat Repair Yard and Boat Basin area for small boats parking at East Bay Gwadar. Length of Breakwater is 1450 RM, Boat Repair Yard 1800 sqm and Auction Hall 300 sqm. Boat Basin Area is around 500,000 sqm for Fishing Boats Parking.
Services
- Topographic & Bathymetric Survey
- Deep Soil & Material Investigation
- Oceanographic Study
- Detailed Structural Design, including Auction Hall
- Feasibility Study
- Geometric Design
- EIA Study
- Tender Documents
- Comprehensive Final Report
- PC-I & Cost Estimates
- Construction Supervision