Embassy of Afghanistan

The Project comprises Administration Building including Conference Room, Multipurpose Hall for 500 People adjustable for ceremonies & dining and Parking for 53 VIP Cars, Ambassador’s Residence, Residential Apartments for Diplomats, Consulate Section and Sports Area in Ambassador’s Resident, Residential Area for Diplomats & in Consulate section.

Naya Nazimabad Infra structure

Naya Nazimabad is not merely a housing project but a value for money life style concept that is tastefully designed to create the right space that aspires serenity pleasing environ alluring simplicity & un matched no harmony that makes it your mark of pride.

The Project comprises the design of Road Networks, Storm Water Drainage, Sewerage System & Water Supply system, Electrification & Telecommunication along with ancillary items for Phase 1.

Green Line Bus Rapid Transit System

Proposed route for Green Line starts from Municipal Park, Saddar to KESC Power House Chowrangi, Surjani. This busway will be constructed (dedicated for BRT vehicles) in the median of the roads along the corridor with stations in the center of the median in both at grade and elevated sections which all provide high speed (25 Km/h) and high capacity (29,400 passengers per hour per direction) service. The design capacity of the proposed BRT system with passing lanes provision will increase based on the number of direct / express services run between stations in the future, as required.

The main project objectives are to provide reliable, safe, affordable, high quality and fast BRT Bus Service; to improve the quality of life of commuters in Karachi; to vastly improve the quality of public transport system in Karachi; to provide infrastructure that allows buses to ply in an efficient manner with exclusive right-of-way for a significant portion of their route length and reduce travel time.

Ten Education Complexes – USAID

The United States Agency for International Development (USAID) in Pakistan, Office of Infrastructure & Engineering (OIE), requires comprehensive program management services including the design, construction management, equipping, and construction services for ten new Faculty of Education complexes at the following existing university campuses:

1. University of Peshawar, Peshawar
2. Gomal University, D.I. Khan
3. Malakand University, Malakand
4. University of Punjab, Lahore
5. Fatima Jinnah Women University, Rawalpindi
6. Bahauddin Zakaria University, Multan
7. Islamia University, Bahawalpur
8. Karakoram International University, Gilgit
9. University of Azad Jammu & Kashmir, Muzaffarabad
10.Lasbela University, Lasbela

These new complexes will support the roll-out of new teaching degrees. All new buildings designed, constructed, and equipped under this contract will be environmentally friendly and energy efficient.

BF Tower

The Project for the Federal Employees Benevolent & Group Insurance Funds is located in Blue Area (Jinnah Avenue) Islamabad. The BF Tower has been planned for construction as a mixed-use, multi-story commercial building and is designed to accommodate commercial retail, office floors, health club, food court and a 4 screen Cineplex with a roof top restaurant. The building has 6 basements for car parking, and Ground plus 22 storeys achieving a total height of 100 meters. The tower has building integrated photo voltaics on the curtain wall cladding and will be an energy efficient building with a reduced carbon footprint.

Baba Fareed Bridge

The Project involved the construction of a Bridge including Approach Road and training Works. The Project aims at providing an all-weather road link across river Sutlej between Pakpattan and Minchinabad to serve the adjoining areas. Feasibility Study was carried out by NHA in 1990 whereas study & design was updated in August 2005. . Bridge has 572 meters length, 13 Nos.span of 44m each. Carriageway width is 9 meter. Length of approach road is 8 km (4 km on each side of Bridge).

National Stadium Karachi

The extension work comprises the construction of additional floors in the Main Pavilion area for various facilities like dining rooms, lounges, offices for Cricket board officials etc. In order to increase the seating capacity of the stadium for general public, additional tiers are constructed by dismantling the existing roofing system of steel trusses and after construction of additional tiers re-installation of the roof trusses. Also retail shops are constructed at the ground floor under the tiers area around the stadium.

Gwadar Water Front

The Project related to the Master Planning of Gwadar Waterfront from Gwadar west bay to Jiwani, a coastline of 150 Km. The Master Planning objective were the Socio – Economic uplift of the coastal settlements with provision of local facilities and infrastructure, creation of job opportunities and tourism development.

Bahria Icon Flyover & Underpasses

The project comprises One Flyover & Three Underpasses, which caters the traffic need from two swords roundabout, Bilawal House and other directions to Abdullah Shah Ghazi’s shrine and the Bahria Town Icon building. It is the Grade Separated Traffic Improvement Plan from Park Tower Intersection to A.T. Naqvi Roundabout. The underpasses have the latest electronic system of international standards. The lengths of barrels are 160m & 95m and the main bridge is 200 metres long.

IBA City Campus- Aman Tower

The 14 storey building houses a complete educational complex. Some prominent features include the podium floor, library floor, three stories of lecture rooms and breakout rooms connected by mid-level lounges, a full floor for cafeteria (student & executive) with two roof gardens placed on the partially exposed 5th level, two floors for administration offices and two floors of residential suites with hotel standard bedrooms.