Hyderabad-Mirpurkhas Road

This project provides for dualization of existing 59 kilometer long 2 lane road from Hyderabad to Mirpurkhas under Public Private Partnership arrangements. Major features under the projects include 04 major bridges, 27 culverts and 02 toll plaza along with modern roadside furniture, lane marking and signage to be the existing 2 lane road to a 4 lane expressway meeting international standards.

DGSE Housing Colony

Housing Colony for Staff and Teachers of National Special Education Centers has been planned by Directorate General Special Education. This project is comprises the residential accommodation for staff of grade 1 to 19.

Lahore Garment City

The Lahore Garment City Company is the first of the three Garment Cities to acquire registration as a corporate entity. The Company is setting up the first Garment City in Pakistan at Sunder. The Garment City would be a cluster of manufacturing units served by a centralized administrative block, providing common facilities in the shape of a training centre, testing laboratory, exhibition and conference halls. The factory units are of three different sizes, each building constructed on five floors plus a basement. The units are to be designed and constructed according to international requirements of social compliance, industrial and environmental standards, and state of the art facilities.

Khuzdar Elementary College

This project comprises College Building, School Building, Hostel Building, Principal’s Bungalow, Teacher’s Residence, Servant’s Residence, Bus Garage, Overhead and Underground Tanks, Compound Wall and Leveling & Dressing.

Sarai Gambila Karak Section

The project consisted of design and construction supervision of a 60 Km two lane new carriageway for realigned stretch of Indus Highway between Sarai Gambila & Karak. The project included 9 main bridges (2446 metres), 83 box culverts, several other drainage structures and a toll plaza.

Bahria Town Karachi

The overall development at Super Highway is spread over an area of more than 600 acres and includes residential and commercial plots, Bahria apartments, office building, Hospital, Cinema, Jamiah Masjid, International Standard School, Bahria homes, Culverts, Bridges, etc. This gated community is situated 9km from Toll Plaza on Karachi-Hyderabad Super highway.

Interchange at H.I.R. Road

The project has been taken as part of Tameer-e-Karachi Program for maintenance of Karachi roads and construction of interchanges, flyovers and underpasses. Interchange on Shahrah-e-Faisal and H.I.R. road (Karsaz) have certainly minimized the traffic problems and ensured uninterrupted traffic flow on Shahrah-e-Faisal.

Dow University of Health Sciences

This Project spreads on 138 acres comprises a Nursing Institute (G+2), Nursing Hostel (G+2), Academic Block for 1500 Students (G+2), Library (G+2), Labs & Genetic Research Centre, 100 Nos Apartments. for junior staff (G+4), 30 Nos Apartments. for senior staff (G+4), 200 bed Hospital for special diseases (G+2), Sports Complex including Football, Hockey & Cricket Stadiums, Squash Court, Swimming Pools, Basket Ball & Volley Ball Courts & Gymnasium.

National Institute of Cardiovascular Diseases

Extension of 2 floors of NICVD was planned, designed and supervised by Engineering Associates and Saleem Ahmed Associates. This project comprises all allied facilities like Intensive Care unit (ICU), Coronary Care Unit (CCU) etc. with infrastructure planning, design and monitoring including plumbing, electrical and air-conditioning design including doctors and nurses hostels and planning of landscape.

Interchange at Hassan Square

The project has been taken as part of Tameer-e-Karachi Program for maintenance of Karachi roads and construction of interchanges, underpass and flyovers.

Karachi faces a very severe problem of excessive traffic especially at the intersection of University Road and Sir Shah Suleman Road which is a very busy intersection carrying more than 225,000 vehicles per day. The objective of the construction of Hasan Square Interchange is to ensure smooth and un-interrupted traffic flow, help in reducing the accident by increasing the safety measures and to reduce the vehicle operating costs.