Flyover and Underpasses along Bahria Icon Tower Road

Location Bahria Town Icon Tower Road Clifton, Karachi. Sector Bridges, Underpasses & Tunnels Total Cost PKR 1.2B Year 2015 Client Bahria Town (Pvt.) Ltd. Project Background The underpasses are located in front of Park Tower (with a barrel length of 62 meters) and at Bahria Town Icon (with barrel lengths of 160 meters and 95 meters). The flyover is situated at A.T. Naqvi Chowrangi, where the main bridge spans 200 meters. These infrastructure elements—flyover and underpasses—are designed to accommodate traffic originating from Two Swords Roundabout, Bilawal House, Abdullah Shah Ghazi’s shrine, and the Bahria Town Icon building. Services Topographic survey, cross-sections, and contouring Traffic data collection, analysis, and forecasting Topographic survey, cross-sections, and contouring Traffic data collection, analysis, and forecasting Hydrology, drainage, and alignment improvements Pavement, flyover, and road design Geotechnical investigations and material studies Construction drawings, location plans and design reports Preliminary and final design reports Engineer’s estimates and tender documentation Supervision of earthworks, mix designs, and pavement works Quality control, testing, and structural supervision Monthly progress reporting and bill verification

Kohat Tunnel & Approach Roads

Kohat-Tunnel-Approach-Roads

Location Kohat, Khyber Pakhtunkhwa Sector Bridges, Underpasses & Tunnels Total Cost PKR 5.6B Year 2003 Client National Highway Authority Project Background Indus Highway taking off from Peshawar, passes over a hill rising to a height of 900 meters. The distance between the towns of Peshawar and Kohat, over the existing hill route is nearly 65 km. The National Highway Authority carried out the project to build a tunnel through the hill range with a view to reducing the distance. The length of the tunnel is 1.885 km. The tunnel will reduce the distance between Peshawar and Kohat by 20 km. Also, the travel time will be much reduced as the speed will increase from the present 40 km per hour to 70 km per hour. In addition travel over the steep and dangerous hill route, that causes many accident, will be avoided. Construction of the project has recently completed. Services EA’s scope of services included complete design and engineering solutions for bridge structure and infrastructure development. This covered feasibility analysis, structural design, geotechnical investigations, and construction supervision. Specialized expertise was applied in steel arch design, load testing, and quality assurance to ensure durability and safety. EA also coordinated with international consultants to align technical standards and project execution with global best practices. Detailed Construction Management & Supervision and Quality Control