Location
Thar
Sector
Public Health
Total Cost
PKR 6.6B
Year
2022
Client
Sindh Coal Authority
Project Background
The project includes Design and Construction Supervision of 50 Cusecs Drainage of Wastewater & Effluent Channel / Pipeline from Mining Area of Thar Coal Field Unit No. 2. In order to initiate open case mining activity in Thar, the need of highly efficient waste disposal system is considered necessary which is estimated to be 50 Cusecs. This waste water is required to be disposed off through transmission line. EA has taken up the task of designing an efficient, environment friendly and socio-economically viable effluent disposal system. Project Brief: GRP Pipe Line Length: 37 Km, Dia of GRP Pipe: 1200 mm, Stone Pitching: 7.7 Km x 5.0 m.
Services
EA’s scope of services included complete design and engineering solutions for bridge structure and infrastructure development. This covered feasibility analysis, structural design, geotechnical investigations, and construction supervision. Specialized expertise was applied in steel arch design, load testing, and quality assurance to ensure durability and safety. EA also coordinated with international consultants to align technical standards and project execution with global best practices.
- Topographic Survey
- Geotechnical Investigation
- Detailed Designing of Pipeline and allied works
- Structural Designing
- Design of Inlet & Outfall Chamber
- Preparation of contract documents
- Preparation of Evaluation Report
- Construction Management and Supervision