50 Cusec Drainage of Wastewater / Effluent Channel from Mining Areas of Thar Coal Field

Location

Thar

Sector

Public Health

Total Cost

PKR 6.6B

Year

2022

Client

Sindh Coal Authority

Project Background

The project includes Design and Construction Supervision of 50 Cusecs Drainage of Wastewater & Effluent Channel / Pipeline from Mining Area of Thar Coal Field Unit No. 2. In order to initiate open case mining activity in Thar, the need of highly efficient waste disposal system is considered necessary which is estimated to be 50 Cusecs. This waste water is required to be disposed off through transmission line. EA has taken up the task of designing an efficient, environment friendly and socio-economically viable effluent disposal system. Project Brief: GRP Pipe Line Length: 37 Km, Dia of GRP Pipe: 1200 mm, Stone Pitching: 7.7 Km x 5.0 m.

Services

EA’s scope of services included complete design and engineering solutions for bridge structure and infrastructure development. This covered feasibility analysis, structural design, geotechnical investigations, and construction supervision. Specialized expertise was applied in steel arch design, load testing, and quality assurance to ensure durability and safety. EA also coordinated with international consultants to align technical standards and project execution with global best practices.