Location
Karachi
Sector
Public Health
Total Cost
PKR 9.1B
Year
2023
Client
Karachi Water and Sewerage Board
Project Background
Karachi has presently 1200 cusecs (650 MGD) approved water quota from Indus River, which is conveyed to the city through 30 km long Canal starting from Kinjhar Lake. Later on the water is transmitted to Karachi through different Bulk Water Supply Systems of Canals, Conduits, Pumping Stations and Filter Plants constructed from time to time under different Water supply Schemes leaving a balance available capacity of 65 MGD from the approved Water Quota of Karachi. As per existing topography, the additional 65 MGD water from the canal shall be transmitted by gravity upto the proposed Gharo Pumping Station from where the water will be pumped to a high point between Gharo Filter Plant and Forebay of KW&SB. From this location, water will gravitate upto Syphon 3 of KW&SB’s Existing Water Supply System and follow its route to reach existing Pipri Filter Plant where a pump house is proposed to be constructed to pump water to a high point near Old KW&SB Rest House. Project Brief: 900 mm RCC Conduit from K.G. Canal to Proposed Haleji (60 MGD) Canal including Intake Structures, Pipe Works, Conduit Works & M.S. Pipe Syphon Work; RCC Open Channel 15 Km & 5 Km RCC Conduit entering Gharo City to Gharo Pumping Station including Intake Structures, Small & Large Conduit, Canal Works & M.S. Pipe Syphon Works etc. New 65 MGD Pumping Station at Gharo including (M&E) works, sub-stations, external development, repair & rehabilitation of existing office building etc. 72″ dia. M.S. Pipe (Pumping main) from Gharo pumping station to Forebay (11.50 Km) including Thurst Boring under Railway crossing; RCC Conduit (2.2m x 2.0m) from Forebay (High Point) to Pipri: 28 Km.
Services
EA’s scope of services included complete design and engineering solutions for bridge structure and infrastructure development. This covered feasibility analysis, structural design, geotechnical investigations, and construction supervision. Specialized expertise was applied in steel arch design, load testing, and quality assurance to ensure durability and safety. EA also coordinated with international consultants to align technical standards and project execution with global best practices.
- Topographic Survey
- Geotechnical Investigation
- Hydraulic Modelling
- Detailed Designing of Pipeline and allied works
- Structural Designing
- Preparation of contract documents
- Preparation of Evaluation Report
- Construction Management and Supervision

