Break Water / Groyne Wall at East Bay

Location

Gwadar

Sector

Ports & Harbors

Total Cost

PKR 1.45B

Area

500,000 sq.m.

Year

2024

Client

Engineering Section, Gwadar Development Authority, Government of Balochistan

Project Background

The main purpose of this project was to provide an alternate mini port to facilitate the local fisherman which were displaced from the existing fish harbor cum mini port in East Bay. Due to CPEC need, the east bay harbor of Gwadar will be developed into the commercial port and free zone area based on the Gwadar Master plan. Therefore, GDA entrusted EA to prepare relevant studies report for the project along with the design and construction supervision of Break Water / Groyne Wall with Auction Hall, Boat Repair Yard and Boat Basin area for small boats parking at East Bay Gwadar. Length of Breakwater is 1450 RM, Boat Repair Yard 1800 sqm and Auction Hall 300 sqm. Boat Basin Area is around 500,000 sqm for Fishing Boats Parking.