Green Line Bus Rapid Transit System

Location

Karachi

Sector

Roads & Highways

Total Cost

PKR 24.6B

Year

2022

Client

Special Project Management Unit, Ministry of Communication, Government of Pakistan

Project Background

The proposed route with Corridor Length of 17.8 km for the Green Line begins at Municipal Park, where a rotary U-turn lane for buses is planned. The alignment extends along M.A. Jinnah Road towards the northeast up to Gurumandir. After Gurumandir, the alignment continues northward along Business Recorder Road, Nawab Siddique Ali Khan Road, Shahrah-e-Shershah Suri, and Shahrah-e-Usman, passing by major landmarks such as Numaish, Board Office, and Nagan Chowrangi. This busway, dedicated to BRT vehicles, will be constructed in the median of the roads along the corridor. Stations will be located in the center of the median in both at-grade and elevated sections, providing high-speed (25 km/h) and high-capacity (29,400 passengers per hour per direction) service. The design capacity of the proposed BRT system, with provisions for passing lanes, will increase based on the number of direct/express services run between stations in the future, as required. The main objectives of the project are to provide a reliable, safe, affordable, high-quality, and fast BRT bus service; to improve the quality of life for commuters in Karachi; to significantly enhance the public transport system in Karachi; to provide infrastructure that allows buses to operate efficiently with an exclusive right-of-way for a significant portion of their route length; and to reduce travel time.

Services