Kech Medical College

Location

Turbat, Pakistan

Sector

Educational

Total Cost

PKR 3.2B

Area

607,144 sq.ft.

Year

2014

Client

Balochistan Engineering Services Agency (Pvt.) Ltd.

Project Background

The Project is related to establishment of medical College at Kech Total Land Area 1000 Acre in District Turbat. The assignment includes master planning through preparation of Bidding Documents. The objective of the project is to provide medical education opportunities to the students of Turbat District who presently are required to get Education in other medical colleges in the province which causes additional expenses and discomfort. Establishment of this medical college will provide adequate medical education facilities to the residents in terms of finance as well as comfort of having education in their own district area. Total Covered Area is 607,144 sq.ft.

Services

EA’s scope of services included complete design and engineering solutions for bridge structure and infrastructure development. This covered feasibility analysis, structural design, geotechnical investigations, and construction supervision. Specialized expertise was applied in steel arch design, load testing, and quality assurance to ensure durability and safety. EA also coordinated with international consultants to align technical standards and project execution with global best practices.