Malir Expressway along Malir River from Super Highway to Korangi Road

Location

Karachi

Sector

Roads & Highways

Total Cost

PKR 27.5B

Year

2020

Client

Local Government Department, Government of Sindh

Project Background

Rapid population growth and unplanned urbanization have exerted considerable pressure on Karachi’s urban transport system, which lacks a modern, integrated framework to efficiently accommodate mobility demands. The resultant increase in traffic volumes has led to chronic congestion, reduced travel speeds, and operational inefficiencies along key arterial corridors. In response, the Local Government Department, Government of Sindh envisaged the development of the Malir River Expressway, a 39.3 km long strategic access-controlled corridor along Right Bank of River Malir from Super Highway to Road 8000 Korangi, Karachi. The expressway is planned to function as a southern bypass, facilitating uninterrupted movement of port- and industry-oriented traffic to the primary highway network, while improving connectivity to planned residential, commercial, and industrial developments along the Malir River corridor.

Services