Location
Peshwar
Sector
Roads & Highways
Total Cost
PKR 9B
Year
2023
Client
National Highway Authority
Project Background
Peshawar Northern Bypass, 30 Km long, is a 4 lane divided facility with service road on both sides. Peshawar Northern Bypass starts from Peshawar toll plaza of M-1 (near end point), passes through agricultural land and small portion of built-up areas. It crosses Budni road near Wadpaga village, Dilazali Road near Muslim school/ Peshawar Degree college. Alignment crosses charsadda road near Khazana sugar mills and runs parallel to Mahtra road and passes besides Khurasan Muhajir Camp.
Services
EA’s scope of services included complete design and engineering solutions for bridge structure and infrastructure development. This covered feasibility analysis, structural design, geotechnical investigations, and construction supervision. Specialized expertise was applied in steel arch design, load testing, and quality assurance to ensure durability and safety. EA also coordinated with international consultants to align technical standards and project execution with global best practices.
- Design Review
- Construction Supervision


