Location
Islamabad
Sector
Industrial
Total Cost
PKR 2.9B
Year
2022
Client
Pakistan International Airlines
Project Background
Pakistan International Airlines (PIA) has planned to construct various buildings at New Islamabad International Airport (NIIAP) those include the following: Maintenance Hanger 48,000.00 Sq.m, Bay Hanger – 90 x 70 x 26m for each Bay. International 9,134 Sq.m. TGS Complex 24,815 Sq.m. including ULD Storage Area 8,750 Sqm. Domestic Cargo Complex 2,496.00 Sq.m. P&L and MT, Works and Administration Building12,200 Sq.m. Flight Kitchen Building 16,740 Sq.m.
Services
EA’s scope of services included complete design and engineering solutions for bridge structure and infrastructure development. This covered feasibility analysis, structural design, geotechnical investigations, and construction supervision. Specialized expertise was applied in steel arch design, load testing, and quality assurance to ensure durability and safety. EA also coordinated with international consultants to align technical standards and project execution with global best practices.
- Topographic Survey
- Master Planning
- Soil / Geotechnical Investigations
- Architectural Planning and Design
- Structural Design
- Electro-Mechanical (MEP) Design
- Preparation of PC1
- Preparation of Contract Documents
- Pre-construction Services
- Construction Management and Supervision





