PIA Hangers and Various Building at New International Airport

Location

Islamabad

Sector

Industrial

Total Cost

PKR 2.9B

Year

2022

Client

Pakistan International Airlines

Project Background

Pakistan International Airlines (PIA) has planned to construct various buildings at New Islamabad International Airport (NIIAP) those include the following: Maintenance Hanger 48,000.00 Sq.m, Bay Hanger – 90 x 70 x 26m for each Bay. International 9,134 Sq.m. TGS Complex 24,815 Sq.m. including ULD Storage Area 8,750 Sqm. Domestic Cargo Complex 2,496.00 Sq.m. P&L and MT, Works and Administration Building12,200 Sq.m. Flight Kitchen Building 16,740 Sq.m.

Services

EA’s scope of services included complete design and engineering solutions for bridge structure and infrastructure development. This covered feasibility analysis, structural design, geotechnical investigations, and construction supervision. Specialized expertise was applied in steel arch design, load testing, and quality assurance to ensure durability and safety. EA also coordinated with international consultants to align technical standards and project execution with global best practices.