Red Line Bus Rapid Transit System

Location

Karachi

Sector

Roads & Highways

Total Cost

PKR 141B

Year

2028

Client

TransKarachi

Project Background

The project starts from Numaish Chowrangi, near Mazar-e-Quaid interfacing with the BRT Green Line, where it goes through New M.A Jinnah Road, Jail Chowrangi, Askari Park, Civic Center, University Road, Safoora Chowk, Malir Cantt Gate No. 6, and ends at Model Colony near the Karachi International Airport. The Red Line Corridor consists of 23 bus stations, 17 pedestrian bridges, 2 bus depots, 5 flyover bridges, 5 underpasses, 8 elevated U-turns, and 1 elevated rotary. The Red Line integrates within the Green Line and Blue Line BRT Corridors at the Numaish Underpass. The overall length of the BRT Red Line is 27.6 km.