Sheikh Zayed Gateway Third Bridge Crossing Abu Dhabi Island

Location

Abu Dhabi

Sector

Overseas

Total Cost

PKR 12.3B

Year

2001

Client

Rendel, Palmer and Tritton (UK)

Project Background

The bridge carries two independent carriageways, each with four lanes 3.65 meters width, two shoulders of 3.0 meters width and a 1.5 meter wide sidewalk for emergency use adjacent to the outer shoulder. The overall length of the bridge is 912 metres between abutments and the width between parapets is 23.6 metres for each deck.

Services

EA’s scope of services included complete design and engineering solutions for bridge structure and infrastructure development. This covered feasibility analysis, structural design, geotechnical investigations, and construction supervision. Specialized expertise was applied in steel arch design, load testing, and quality assurance to ensure durability and safety. EA also coordinated with international consultants to align technical standards and project execution with global best practices.