Signal Free Corridor including Roads, Flyover and Underpasses by LDA

Location

Lahore

Sector

Roads & Highways

Total Cost

PKR 13.6B

Year

2016

Client

Lahore Development Authority

Project Background

The project involved designing and construction of signal-free corridors with underpasses, protected signal-free U-turns, eliminating traffic signals and reducing conflict points. The project also incorporated flyovers and pedestrian overhead bridges to enhance grade separation and pedestrian safety. As a result, the project successfully removed multiple traffic signals, improved traffic efficiency, and provided a safer, uninterrupted, and high-capacity urban transport corridor. Following Major Projects were designed & supervised: Signal free corridors (7 Km)on Jail Road and Main Boulevard Gulberg, Lahore including, Construction of two Underpasses, Construction of protected 12 nos. U-turns, Construction of flyovers (The right-turn flyover is 2 lanes, the Bridge length is 238m whereas Ramp lengths are 80m & 82.5m.), Construction of pedestrian overheads, Rehabilitation of main boulevard Gulberg and Jail road, Improvement of Maulana Shaukat Ali Road to Multan Road via Kareem Block Market, Lahore, Link Connecting Shahpur Kanjran to Raiwind Road & Khyban-e-Jinnah, Lahore, Kasur Bypass connecting Ferozpur Road with Depalpur Road, Underpasses at Shaikhupura – Gujranwala Road and Shaikhupura – Hafizabad Road, Widening & Improvement of Main Shaikhupra Road and Sharaqpur Road, Construction of Bridges at WASA, Phase-I, TPV Projects, Widening of Canal Bank Road from Thokar Niaz Baig to Doctor’s Hospital, Lahore – Package-01, Construction of Chaubucha Underpass – Package-03, Widening of Canal Bank Road from Mall Road to Harbanspura, Lahore – Package-02.

Services