Location
Al-Ain, UAE
Sector
Overseas
Total Cost
USD 180.6M
Total Cost
PKR 16.9B
Year
2012
Client
Municipalities and Agriculture Department, Al-Ain Municipality
Project Background
The Project comprises of new dual carriageway (6.5 Km approx) having 3 lanes in each direction and upgrading of existing northern ring road (12.8 Km approx), a 3 lane flyover bridge at Al Ain-Dubai Road, a 4 lane dual carriageway underpass at the location of the Bida Binte Saud Roundabout, a 4 lane carriageway underpass at the location of Al-Towayya Roundabout, Al Foah Underpass, Wadi Bridges, T-junctions, Landscaping, storm water drainage, street lighting and necessary road furniture.
Services
EA’s scope of services included complete design and engineering solutions for bridge structure and infrastructure development. This covered feasibility analysis, structural design, geotechnical investigations, and construction supervision. Specialized expertise was applied in steel arch design, load testing, and quality assurance to ensure durability and safety. EA also coordinated with international consultants to align technical standards and project execution with global best practices.
- Topographic Survey
- Traffic Survey
- Deep Soil and Material Investigation
- Feasibility Study
- Geometric Design
- Structural Engineering
- Landscape Architecture
- Electrification
- Drainage Study and Design
- Tender Document
- Construction Supervision