DHA Phase 1 V Project

Improvement of Water Supply System of Defence Housing Authority( Phase – I to Phase –V) was developed as discrete incremental system without a master plan and water was not conveyed to all the consumers. This existing system was analyzed by actual exploratory digging and making the plan of existing network. This was then checked by Hardy Cross System and deficiencies were identified. The rehabilitation plan was prepared for improvement of the system.

Mingora Water Supply Scheme

Providing intake works at Swat River, Transmission main, Treatment works and distribution mains.

Bin Qasim Industrial Park

This Project (phase 1) consists of planning, designing and detailed supervision of 16.5km of HDPE Pipe with different dia. Pipe. This also includes construction of Pumping Station with Pumping System including construction of chambers for Air Valves & Gate Valves.

Bannu City Project

This project provided for survey and design for sewerage & drainage of Bannu city & cantonment along with treatment plant for sewage and disposal of treated effluent.

Aga Khan Storm Water Drainage

Report for this project comprises the study for the levels of catchments area, preparation of alternative proposals for storm water drainage and outfall, detailed design of drainage channels, structures, culverts and outfalls.

West Extension of Al Foah

The project comprises consultancy services for the construction of Sewerage & Stormwater Networks, Internal Roads, Parking, Street Lighting for the West Extension of Al Foah area.

Gravity Water Supply Scheme

This project provides a water supply system based on the water springs in the surrounding hills of Abbottabad city. This entailed water discharge measurements of available source and their seasonal variations and selection of source, site of intake work and alignment of transmission main.