Hyderabad Sewerage Scheme

Master Plan of Greater Hyderabad Sewerage Project (phase 1) was prepared by Hyderabad Development Authority through their Consultants M/s. D. Balfour and Sons in 1984. This Master Plan was divided into different Phases. The Executive Committee of the National Economic Council approved PC-I of Phase-I. This Phase-I of the Project provides for rehabilitation of the existing sewerage system and laying of comprehensive Sewerage System in Latifabad and Pretabad, extension of Northern Sewage Treatment Work and Construction of additional Sewage Treatment Plant for the existing and new development in the Western areas of Hyderabad City.

THQ Hospitals

The project has been undertaken to provide quality medical services to the ailments of the catchment population of Taluka concerned; to ensure emergency medical cover especially for round the clock 7 days a week and to increase the medical services as per the set minimum services standards of Government of Sindh. Upgrading & Revamping of the secondary health care facilities i.e. 39 THQ Hospital and construction of Emergency cum Trauma Centres 41 Nos. in THQ Hospital

Multan Inner Ring Road

The project comprises Geometric Improvement of Multan Inner city Ring Road Including Six Interchanges with Improvement of at grade Intersections

Fresh water treatment Facilities

CHINA PAKISTAN ECONOMIC CORRIDOR invested heavily to make Gwadar one of the mega cities of Pakistan. A total of 14MGD is supplied to Gwadar city through this project.
It consists of three major components:

Transmission line from Swad Dam and Shadi Kaur Dam to Gwadar city
Water supply distribution system and sewerage system along with its safe disposal for extension of Gwadar city
Reverse Osmosis Plant

Rolex Tower

This project comprises a 30-storey residential tower, 3-storey retail podium and 5-levels basement car parking.

Arthal (Harten) Bridge

The project comprises the New Bridge over Kabul River & Rehabilitation of existing Arthal (Harten) bridge and the access roads. The work was awarded to EA Consulting Pvt. Ltd. (Consultants) after due bidding and selection process by UNOPS. The existing Arthal Bridge over Kabul River is located in the middle of Kabul City, forms an important crossing point North-South over the Kabul River and is in the vicinity of a key road junction. The proposed Bridge was designed adjacent to the existing Bridge. Project comprises a new 42 meters bridge across the Kabul River, Rehabilitation of the existing Arthal Bridge for use by pedestrians and rehabilitation of necessary road approaches.

National Special Education Centers

The project comprises four special education centres for the physically, mentally and visually handicapped students.

Palm Deira First Complex Buildings

The project is a part of the huge development at Palm Deira by NAKHEEL. The First Complex Buildings is a mixed occupancy structure with a maximum built-up area of 314,132 Sq.m. The project consists of 3 Office Towers (20 to 24 stories); 3 Residential Towers (18 storeys each) with Roof Top Health Club & Pool; Ground + Podium-1 (2 level) shopping mall with office and residential towers sitting on a common podium; 2 level of Basements car park.

The site is located at Palm Deira corniche, stretch over four kilometers along the Old Deira corniche. The most prominent feature of the Project is a 33m long Cantilever Office Tower in Block-6.

Saidu Hospital

There was a great demand to establish the medical college in Swat to facilitate the students to get medical education locally and fulfill the shortage of doctors in this area. Keeping in view the need for a medical college, Government of NWFP has recently established the Saidu Medical College at Swat District. For a medical college, it is compulsory to have an equipped and sizeable teaching level hospital. To fulfill this requirement, the existing Saidu Group of Hospital needed the upgradation to the level of a teaching hospital (500 bedded) due to the existing inadequate capacity and facilities

Interchange at Faisal Avenue

Faisal Avenue is one of the major roads intersecting Jinnah Avenue which is one of the busiest roads of Islamabad. Project comprises the design of Flyover and Underpass on the intersection of Faisal Avenue and Jinnah Avenue, Islamabad. Bridge length is about 332 meters while the ramp length of is 278 meters. The barrel length of Underpass is 90 meters with a clearance of 5 meters.