EQDR Roads of Balakot to Naran Section

Location Balakot & Naran Sector Roads & Highways Total Cost PKR 1.6B Year 2011 Client National Highway Authority Project Background The project is a rehabilitation of National Highway N-15, Basian-Balakot-Naran Section, one of the badly damaged four major roads by the earthquake of October 2005, has been undertaken by NHA under contract -16, 65 km, with financial assistance from the World Bank, is included in the rehabilitation / reconstruction work. The first phase starts from km 37+600 and ends at km 81+600 (Balakot to Mahandri 44 km length). The road lies to the east of the river “Kunhar” in a steep side valley. The damage is extensive and comprises slips, slides and longitudinal and transverse cracks. The rehabilitation stategy includes widening the vROW from 13 m to 20 m improving the alignment reconstruction of retaining wall, breast wall and reconstruction of Bridges, Culverts and Causeways. Services EA’s scope of services included complete design and engineering solutions for bridge structure and infrastructure development. This covered feasibility analysis, structural design, geotechnical investigations, and construction supervision. Specialized expertise was applied in steel arch design, load testing, and quality assurance to ensure durability and safety. EA also coordinated with international consultants to align technical standards and project execution with global best practices. Supervision of earthworks for cut and fill. Supervision of mix design for asphalt and concrete. Supervision for pavement construction. Quality controls and testing of works. Supervision of culverts and retaining structures. Submission of monthly progress reports. Checking and verification of contractor’s bills.
Rehabilitation of Indus Highway N-55 including Bridges (Phase I, II & III)

Location KPK, Punjab and Sindh Provinces Sector Roads & Highways Total Cost PKR 15.4B Year 1999 Client National Highway Authority Project Background The project consisted of design / design review and construction supervision of Indus Highway [N-55]: Design Review & Construction Supervision for Rehabilitation of Phase – 1 Contract-1 Section Kotri-Manjhand comprises 58 km new pavement including 12 main Bridges and 20 Overhead Bridges. Design Review & Construction Supervision for Rehabilitation of Phase – 1 Contract – 2, Manjhand – Sehwan Section, including 4 Bridges with prestressed girders pile foundations and more than 150 box culverts; Design & Construction Supervision for Rehabilitation of Phase II, Contract 12-A, Sarai Gambila-Karak Section a 60 Km two lane new carriageway including 9 main bridges (2446 metres), 83 box culverts, several other drainage structures and a toll plaza; Design & Construction Supervision for Rehabilitation of Phase II, Contract-12B Karak-Karappa Chowk Section a 36 Km two lane new carriageway including 6 main bridges, 50 box culverts, several other drainage structures and a toll plaza. Detailed Design of 450km Phase – III The alignment passes through the cities of Rajanpur, Dear Ghazi Khan in Punjab and Dera Ismail Khan in N.W.F.P. including 53 Bridges (6,097 metres), one Overhead Bridge and some overpasses across the railway track. Services Topographic Survey Hydrology Traffic Study Design Review / Detailed Design BOQ and Tender Documents Supervision of Pavement Construction Material Sourcing and Testing Quality Control of Construction Works Monthly Progress Reports Checking and Verification of Contractor’s Bills Maintenance of Soil Testing Laboratory and Survey Equipment