Red Line Bus Rapid Transit System

Location Karachi Sector Roads & Highways Total Cost PKR 141B Year 2028 Client TransKarachi Project Background The project starts from Numaish Chowrangi, near Mazar-e-Quaid interfacing with the BRT Green Line, where it goes through New M.A Jinnah Road, Jail Chowrangi, Askari Park, Civic Center, University Road, Safoora Chowk, Malir Cantt Gate No. 6, and ends at Model Colony near the Karachi International Airport. The Red Line Corridor consists of 23 bus stations, 17 pedestrian bridges, 2 bus depots, 5 flyover bridges, 5 underpasses, 8 elevated U-turns, and 1 elevated rotary. The Red Line integrates within the Green Line and Blue Line BRT Corridors at the Numaish Underpass. The overall length of the BRT Red Line is 27.6 km. Services Project Management Data Validation Review of Studies, Surveys and Reports Updating of RP & LARP Design Review and Re-Design BOQs, Contract Documents and Technical Specifications Construction Supervision
Malir Expressway along Malir River from Super Highway to Korangi Road

Location Karachi Sector Roads & Highways Total Cost PKR 27.5B Year 2020 Client Local Government Department, Government of Sindh Project Background Rapid population growth and unplanned urbanization have exerted considerable pressure on Karachi’s urban transport system, which lacks a modern, integrated framework to efficiently accommodate mobility demands. The resultant increase in traffic volumes has led to chronic congestion, reduced travel speeds, and operational inefficiencies along key arterial corridors. In response, the Local Government Department, Government of Sindh envisaged the development of the Malir River Expressway, a 39.3 km long strategic access-controlled corridor along Right Bank of River Malir from Super Highway to Road 8000 Korangi, Karachi. The expressway is planned to function as a southern bypass, facilitating uninterrupted movement of port- and industry-oriented traffic to the primary highway network, while improving connectivity to planned residential, commercial, and industrial developments along the Malir River corridor. Services Topographic surveys and geotechnical investigations Traffic (incl. O-D), hydrology, materials and geological studies Feasibility Study and Transaction Advisory Services Preliminary design of bridges, roads, pavements and culverts Preliminary environmental and social impact assessments Bidding documents and PPP Unit / Policy Board proposal Information Memorandum for roadshows and marketing Bid management, evaluation and support to financial close
Quality Control Services for Peshawar-Karachi Motorway, Sukkur-Multan Section

Location Multan Sector Roads & Highways Total Cost PKR 576.8B Year 2020 Client China State Construction Engineering Corporation Ltd. and National Highway Authority Project Background The Government of Pakistan through National Highway Authority (NHA) has planned to construct 392 Km. long 6- lane Motorway between Multan to Sukkur as a part of Peshawar -Karachi Motorway. It also comprises construction of all allied structures (culverts, bridges / interchanges) and construction of 2-lane service roads on the either side of the Motorway. The proposed section of Motorway shall be further divided into seven sub-sections approx.55~60 Km. each to facilitate its construction. The contract of motorway project has been signed between CSCEC and NHA. CSCEC has become the EPC contractor of this project. EA has been hired as a in house team of consultant of this project by CSCEC, in charge of the quality assurance service and quality control service of section I (stake mark from K380+000 to K435+000), and section III (stake mark from K491+000 to K550+000), and section VII (stake mark from K716+000 to K772+200). Services EA’s scope of services included complete design and engineering solutions for bridge structure and infrastructure development. This covered feasibility analysis, structural design, geotechnical investigations, and construction supervision. Specialized expertise was applied in steel arch design, load testing, and quality assurance to ensure durability and safety. EA also coordinated with international consultants to align technical standards and project execution with global best practices. Establishing the adequacy, stability, safety, economy and functionality of construction drawings and specifications, and their adherence to relevant codes Quality assurance of all works during pre-construction and construction, as per approved designs, specifications and sound engineering practice
Peshawar – Karachi Motorway, Lahore – Abdul Hakeem Section on EPC/ Turnkey Basis

Location Punjab Sector Roads & Highways Total Cost PKR 148.7B Year 2022 Client National Highway Authority Project Background The Government of Pakistan undertook the construction of the Peshawar–Karachi Motorway, including the Lahore–Abdul Hakeem Section, a 230 km long, six-lane, controlled-access motorway executed under EPC mode. The project was financed through Government of Pakistan arrangements and implemented in accordance with FIDIC EPC Conditions of Contract. The National Highway Authority (NHA), as Employer, engaged the services of an Assistant to the Employer’s Representative (AER) to support project execution. The AER assisted the Employer in reviewing the detailed engineering designs prepared by the EPC Contractor, carried out overall supervision of the Contractor’s supervisory consultant, validated milestones for payments, and verified selected tests during construction and at completion. These services ensured that the motorway was delivered in compliance with the prescribed specifications, standards, and quality requirements for an ITS-enabled motorway. Services Review of surveys, geotechnical, traffic, hydrology, materials and geological studies Review of geometric design, bridges, pavements, culverts, ITS, toll plazas and rest areas Review of traffic management plans, drawings and BOQs / estimates Review of contractors’ programmes, schedules and drawings Contract compliance and oversight of construction supervision Motorway operations and highway safety audits Monitoring during operation and maintenance
Green Line Bus Rapid Transit System

Location Karachi Sector Roads & Highways Total Cost PKR 24.6B Year 2022 Client Special Project Management Unit, Ministry of Communication, Government of Pakistan Project Background The proposed route with Corridor Length of 17.8 km for the Green Line begins at Municipal Park, where a rotary U-turn lane for buses is planned. The alignment extends along M.A. Jinnah Road towards the northeast up to Gurumandir. After Gurumandir, the alignment continues northward along Business Recorder Road, Nawab Siddique Ali Khan Road, Shahrah-e-Shershah Suri, and Shahrah-e-Usman, passing by major landmarks such as Numaish, Board Office, and Nagan Chowrangi. This busway, dedicated to BRT vehicles, will be constructed in the median of the roads along the corridor. Stations will be located in the center of the median in both at-grade and elevated sections, providing high-speed (25 km/h) and high-capacity (29,400 passengers per hour per direction) service. The design capacity of the proposed BRT system, with provisions for passing lanes, will increase based on the number of direct/express services run between stations in the future, as required. The main objectives of the project are to provide a reliable, safe, affordable, high-quality, and fast BRT bus service; to improve the quality of life for commuters in Karachi; to significantly enhance the public transport system in Karachi; to provide infrastructure that allows buses to operate efficiently with an exclusive right-of-way for a significant portion of their route length; and to reduce travel time. Services Project Management Topographic, material and geotechnical investigations • Geometric, pavement, hydrology and drainage design Bridges, interchanges, terminals and road furniture • MEP and Intelligent Transport System (ITS) Design Financial & business model and legal framework review Utility folders, land acquisition plans and EIA Tender documents, BOQ, estimates, PC-I and bid evaluation Horticulture and landscaping Construction Management and Supervision
Signal Free Corridor including Roads, Flyover and Underpasses by LDA

Location Lahore Sector Roads & Highways Total Cost PKR 13.6B Year 2016 Client Lahore Development Authority Project Background The project involved designing and construction of signal-free corridors with underpasses, protected signal-free U-turns, eliminating traffic signals and reducing conflict points. The project also incorporated flyovers and pedestrian overhead bridges to enhance grade separation and pedestrian safety. As a result, the project successfully removed multiple traffic signals, improved traffic efficiency, and provided a safer, uninterrupted, and high-capacity urban transport corridor. Following Major Projects were designed & supervised: Signal free corridors (7 Km)on Jail Road and Main Boulevard Gulberg, Lahore including, Construction of two Underpasses, Construction of protected 12 nos. U-turns, Construction of flyovers (The right-turn flyover is 2 lanes, the Bridge length is 238m whereas Ramp lengths are 80m & 82.5m.), Construction of pedestrian overheads, Rehabilitation of main boulevard Gulberg and Jail road, Improvement of Maulana Shaukat Ali Road to Multan Road via Kareem Block Market, Lahore, Link Connecting Shahpur Kanjran to Raiwind Road & Khyban-e-Jinnah, Lahore, Kasur Bypass connecting Ferozpur Road with Depalpur Road, Underpasses at Shaikhupura – Gujranwala Road and Shaikhupura – Hafizabad Road, Widening & Improvement of Main Shaikhupra Road and Sharaqpur Road, Construction of Bridges at WASA, Phase-I, TPV Projects, Widening of Canal Bank Road from Thokar Niaz Baig to Doctor’s Hospital, Lahore – Package-01, Construction of Chaubucha Underpass – Package-03, Widening of Canal Bank Road from Mall Road to Harbanspura, Lahore – Package-02. Services Topographic Survey Traffic Studies Deep Soil & Material Investigation Feasibility Study Geometric Design Structural Design Electrification Drainage Design EIA Study Tender Documents PC-I, Cost Estimates and Tender Documents Construction Supervision
Lyari Expressway including Interchanges, Overpasses & Bridges

Location Karachi Sindh Province Sector Roads & Highways Total Cost PKR 9.7B Year 2017 Client National Highway Authority Project Background Lyari Expressway is a controlled access four lane highway along Lyari River through the metropolitan city of Karachi. The Expressway, 16.5 kms long, is separated by the Lyari River into two carriageways each having 2-lane capacity. This Expressway takes off from North Lyari Bridge near Sohrab Goth on Super Highway and passes enroute through Liaquatabad, Lasbela etc. It will terminate at South Lyari Bridge on Mauripur Road. This expressway includes 4 Interchanges, 6+6 Overpasses, 3 Nullah Bridges & 1 Bridge over Graveyard. Services Feasibility Study Detailed Topographic Survey. Network-based traffic studies for the 17.5 km corridor and design of interchanges and ramps Design of the expressway on both banks of the Lyari River Design of 22 box-girder bridges Design of toll plazas at all entry points Design of reinforced earth bridge approaches Preparation of Tender Documents Detailed Construction Supervision and Management
Hyderabad-Mirpurkhas Road Project on PPP Basis

Location Hyderabad / Mirpurkhas-Sindh Sector Roads & Highways Total Cost PKR 5.1B Year 2012 Client Works & Services Department, Government of Sindh Project Background This project provides for dualization of existing 59 kilometer long 2 lane road from Hyderabad to Mirpurkhas under Public Private Partnership arrangements. Major features under the projects include 04 major bridges, 27 culverts and 02 toll plaza along with modern roadside furniture, lane marking and signage to be the existing 2 lane road to a 4 lane expressway meeting international standards. Services EA’s scope of services included complete design and engineering solutions for bridge structure and infrastructure development. This covered feasibility analysis, structural design, geotechnical investigations, and construction supervision. Specialized expertise was applied in steel arch design, load testing, and quality assurance to ensure durability and safety. EA also coordinated with international consultants to align technical standards and project execution with global best practices. Project Management Design Review of Carriageway Design Review of Bridges / Culverts /Structures etc. Design Review of Toll Plaza Detailed Construction Supervision
Peshawar Northern Bypass

Location Peshwar Sector Roads & Highways Total Cost PKR 9B Year 2023 Client National Highway Authority Project Background Peshawar Northern Bypass, 30 Km long, is a 4 lane divided facility with service road on both sides. Peshawar Northern Bypass starts from Peshawar toll plaza of M-1 (near end point), passes through agricultural land and small portion of built-up areas. It crosses Budni road near Wadpaga village, Dilazali Road near Muslim school/ Peshawar Degree college. Alignment crosses charsadda road near Khazana sugar mills and runs parallel to Mahtra road and passes besides Khurasan Muhajir Camp. Services EA’s scope of services included complete design and engineering solutions for bridge structure and infrastructure development. This covered feasibility analysis, structural design, geotechnical investigations, and construction supervision. Specialized expertise was applied in steel arch design, load testing, and quality assurance to ensure durability and safety. EA also coordinated with international consultants to align technical standards and project execution with global best practices. Design Review Construction Supervision
Inner-city Ring Road (IRR) including Interchanges

Location Multan Sector Roads & Highways Total Cost PKR 7.8B Year 2015 Client National Highway Authority Project Background The Project aims at easing the traffic congestion of Multan City. The project involves the Design & Construction Supervision of Inner City Ring Road Multan (Package – I, II & III) / interchanges including approach roads. Package-I: Construction of Flyover at Jinnah Chowk & Rasheedabad Chowk; Package-II: Construction of Flyover at Chungi # 08 & 09 with bridge length ranging from 225m – 685m. Package-III: Construction of Flyover at Kalma Chowk & Double Phattak with bridge length ranging from 160m – 300m. Services Topographic surveys, cross-sections and contouring Traffic surveys, projections and forecasting Hydrology, drainage and alignment studies Design of pavements, flyovers and approach roads Soil, material and geotechnical studies Construction drawings and preliminary / final design reports Engineer’s estimates, tender documents, BOQs and specifications Supervision of earthworks, mix designs, pavements, bridges and retaining structures Quality control, testing, progress reporting and bill verification