Thar Coal Field Project
Water & Sewerage
Location Thar, Pakistan
Total Cost PKR 3.672 Billion
Year 2014
Client Sindh Coal Authority
- Topographic Survey
- Geotechnical Investigation
- Detailed Designing of Pipeline and allied works
- Design of Intake structures
- Preparation of contract documents
- Preparation of Tender documents
- preparation of prequalification documents
- Preparation of Evaluation Report
- Construction Management and Supervision
50 Cusecs Drainage of Wastewater & Effluent Channel / Pipeline project comprises laying effluent disposal pipeline from Thar Coal Field Unit No.2 to depression area. The pipeline is designed to convey effluent produced during mining for power generation activities, estimated to be 50 cusecs from Thar Coal Field. The total route of disposal Pipeline is around 40 km.
Hydrological studies and drainage pattern of project area is studied to identify the possible depression area for percolation of effluent. Environmental Studies are also carried out to avoid any harm to water quality, wild life and social life of residents.