Faran Sugar Mills

Faran sugar Mills Limited is an Agri-based company, engaged in the business of manufacturing and selling of refined sugar. The company is a unit of Amin Bawany Group which is a leading business group. The project comprises the complete unit for sugarcane crushing, processing & refining plant, the office block, residential and labor colony.

SMBB Towns

The Project related to the Development of Shaheed Mohtarma Benazir Bhutto towns (43 locations) in various towns/ cities of Sindh province including Karachi and Hyderabad. The objective is to create 42,476 plots measuring 120 sq yds on 2,414 acres of land, with all utility services and community facilities. The plots are meant to be given to the poorest of poor and people of low income groups.

Crescent Warehouse

The project comprises a warehouse for pipe manufacturing plant that obtained raw material from the scrap produced by Pakistan Steel Mill. Later on the factory was expanded to include pipe coating facility. The factory produced large size steel pipes used in sewerage and sewage disposal schemes.

Naya Nazimabad School

Primary School Building has a capacity to in-house 250 to 300 students. It offers teaching program from Nursery to Grade 2 and encases all ancillary facilities, for example, library, indoor and outdoor play areas. Elementary School comprises teaching facilities for Grade 3 to Grade 10 with an accommodation of 1000 students per annum. It offers high-end contemporary amenities like Libraries, Computer Labs, Arts & Crafts Section, Multipurpose Hall, 75 Meter Racing Tracks, Out Door Hockey Ground, Basement Car Parking etc.

British Overseas School

The Project included Structural, HVAC and Interior Design for Renovation of 4700 m2 floor space and for expansion of 9500 m2 floor space.

Lahore Dry Port

The Project’s first Phase is developed over 10 Acre of Site on a 30 Acre land space. The facility at Prem Nagar comprises 25,000 sq ft Cargo Shed, Admin Building, Container yard, Workshop with other required facilities of Dry port.

Coral Beach Hotel

The site is located on the Ajman coastline and is almost square in shape. The only road access is from the South-East side whereas the North-West side is facing the beach.

The proposed hotel will come under the category of a four star facility. The approximate built up area of the hotel is 50,000 m2 which comprises two levels of basement parking, Ground floor, First floor (lower), First floor (upper), six typical floors of Hotel rooms and Apartments with a penthouse on the upper floor.

Gharibabad Underpass

The project has been taken as part of Tameer-e-Karachi Program for maintenance of Karachi road and construction of interchanges, flyovers and underpasses. Gharibabad underpass will minimize traffic congestion on Sir Shah Suleman Road and Shahrah-e-Syed Ahmed.

DHA Phase 1 V Project

Improvement of Water Supply System of Defence Housing Authority( Phase – I to Phase –V) was developed as discrete incremental system without a master plan and water was not conveyed to all the consumers. This existing system was analyzed by actual exploratory digging and making the plan of existing network. This was then checked by Hardy Cross System and deficiencies were identified. The rehabilitation plan was prepared for improvement of the system.

QICT Facilities

The QICT project comprises four components of works separately negotiated relating to the development for expansion of container terminal facilities at Bin Qasim and off dock terminal at Karachi. Planning and designing of container 5 high staking, heavy duty flexible pavements, RTG runner beams, operational buildings and construction of 6 meter high ruble bund in creek for the expansion of container terminal at Bin Qasim & setting up off Dock Terminal with related facilities. EA also provided the Security arrangements.