Mingora Water Supply Scheme

Providing intake works at Swat River, Transmission main, Treatment works and distribution mains.

Manjhand Sehwan Section

The project consists of approximately 70 kms of existing Indus Highway [N-55], Contract-2 extending from Manjhand town to Sehwan. The width of the pavement is 7.3m with 3.0m shoulders on both sides. Structures comprised of 4 Bridges with prestressed girders pile foundations and more than 150 box culverts were part of this project.

EA was also responsible for the Maintenance of soil testing laboratory, survey equipment’s renovation & furnishing residence, office and laboratory and lodging, boarding and transport facilities for consultant’s staff

Kotri Kabir-Baberlo Section

The project consists of a total length of 73.5 kms of road construction. It contains approximately 26 kms of Additional Carriageway from Kotri Kabir to Ranipur and from Therhi to Baberlo along the existing alignment. A 45.3 kms dual carriageway provided between Ranipur and Therhi along the realigned stretch of National Highway N-5 and 2.1 km for Baberlo bypass at the end. The entire section of the project is located in Khairpur district and passes through or close to some major population centres e.g. Hangorja, Ranipur and Gambat. Each carriageway is 7.3 meters wide pavement with outer and inner shoulders of 3m and 1m respectively. Structural works include 3 Bridges 4-Lane (71 metres), and 1 Bridge 2-Lane (20 metres) and 173 culverts of different types.

Bin Qasim Industrial Park

This Project (phase 1) consists of planning, designing and detailed supervision of 16.5km of HDPE Pipe with different dia. Pipe. This also includes construction of Pumping Station with Pumping System including construction of chambers for Air Valves & Gate Valves.

PIBT project

The Client (PIBT) intends to set up a dedicated bulk terminal at Port Qasim for the handling and storage of coal, cement and clinker. Master plan of the terminal was developed by Hamburg Port Authority. EA was assigned the project in collaboration with German design consultancy firm SELLHORN to develop the design of the project for the calling bids on EPC basis.

Ormara Naval Harbor

The study included design review/ vetting of proposed marine facilities for Pakistan Navy at Ormara

Nawabshah Hospital

The 300-Bed Healthcare Project with Maternal and Childcare Institute comprises OPD, Wards, Emergency, Radiology & Labs, OT, Doctor Area , and ancillary facilities. This Hospital will cater the patients of Nawabshah and other nearby towns. Such a large Hospital does not exist in the whole Sindh Province except in Karachi.

Kharian Sohawa Section

The project section located in the northern Punjab province, extends through Kharian and Jehlum districts. Total length of this section of the road is 62.5 km (additional carriageway) of N-5 with major bridges over river Jehlum, Dina and Bakrala. 6 Bridges (1,595 metres) and 5 Overhead Bridges were also the part of this project. Four two lanes and One four lane overhead railway bridges were also the part of this project.

Attock Cement residences

The residential colony of the Attock Cement Factory is situated adjacent to the factory complex at a distance of 15km North of Hub Chowki, Balochistan.

Mekran Medical College

The Government of Balochistan has allotted an area of 1,088 acre for Mekran Medical College, located in the north west of the Turbat City on M-8, Gwadar-Ratodero Motorway. At present, the project is proposed to cover an area of 850,000 square meters (210 acres), while remaining is reserved for future extension, and a Teaching Hospital.

The project consists of faculty building, academic block, administration block, library, gymnasium, auditorium, hostels, residential buildings and allied facilities.