65 MGD Bulk Water Supply scheme from Haleji to Pipri

Location Karachi Sector Public Health Total Cost PKR 9.1B Year 2023 Client Karachi Water and Sewerage Board Project Background Karachi has presently 1200 cusecs (650 MGD) approved water quota from Indus River, which is conveyed to the city through 30 km long Canal starting from Kinjhar Lake. Later on the water is transmitted to Karachi through different Bulk Water Supply Systems of Canals, Conduits, Pumping Stations and Filter Plants constructed from time to time under different Water supply Schemes leaving a balance available capacity of 65 MGD from the approved Water Quota of Karachi. As per existing topography, the additional 65 MGD water from the canal shall be transmitted by gravity upto the proposed Gharo Pumping Station from where the water will be pumped to a high point between Gharo Filter Plant and Forebay of KW&SB. From this location, water will gravitate upto Syphon 3 of KW&SB’s Existing Water Supply System and follow its route to reach existing Pipri Filter Plant where a pump house is proposed to be constructed to pump water to a high point near Old KW&SB Rest House. Project Brief: 900 mm RCC Conduit from K.G. Canal to Proposed Haleji (60 MGD) Canal including Intake Structures, Pipe Works, Conduit Works & M.S. Pipe Syphon Work; RCC Open Channel 15 Km & 5 Km RCC Conduit entering Gharo City to Gharo Pumping Station including Intake Structures, Small & Large Conduit, Canal Works & M.S. Pipe Syphon Works etc. New 65 MGD Pumping Station at Gharo including (M&E) works, sub-stations, external development, repair & rehabilitation of existing office building etc. 72″ dia. M.S. Pipe (Pumping main) from Gharo pumping station to Forebay (11.50 Km) including Thurst Boring under Railway crossing; RCC Conduit (2.2m x 2.0m) from Forebay (High Point) to Pipri: 28 Km. Services EA’s scope of services included complete design and engineering solutions for bridge structure and infrastructure development. This covered feasibility analysis, structural design, geotechnical investigations, and construction supervision. Specialized expertise was applied in steel arch design, load testing, and quality assurance to ensure durability and safety. EA also coordinated with international consultants to align technical standards and project execution with global best practices. Topographic Survey Geotechnical Investigation Hydraulic Modelling Detailed Designing of Pipeline and allied works Structural Designing Preparation of contract documents Preparation of Evaluation Report Construction Management and Supervision

Conveyance System of Bulk Water from Swad Dam & Shadi Kaur Dam to Gwadar City

Location Gwadar, Balochistan Sector Public Health Total Cost PKR 8.2B Year 2023 Client Gwadar Development Authority Project Background Gwadar Development Authority (GDA), under the umbrella project “Necessary Facilities of Fresh Water Treatment, Water Supply & Distribution Gwadar” with an approved PC-1 cost of Rs. 11,322.00 million, is facilitating the population of the city. The Project is being executed in different phases. Phase-I: Design & Construction Supervision of the 7.5 MGD Water Transmission Main from Swad Dam to Gwadar City, comprising HDPE pipelines of 710 mm (50 km) and 630 mm (20 km), a 6.5 MGD underground water storage tank and three pumping stations, along with surface reservoirs and a chlorination tank. Phase-II: Design & Construction Supervision of the 2.5 MGD Water Transmission Main from Shadi Kaur Dam to Chaud Daggar, with an 84 km HDPE pipeline (500 mm) and two pumping stations. Phase-III: Design & Construction Supervision of the 5 MGD Water Supply Distribution System & Sewerage Network for Gwadar City, with 140 km of HDPE water pipelines (90–500 mm), 18.4 km of sewer pipes (300–500 mm) and four pumping stations. Services Topographic Survey Geotechnical Investigation Pipeline Design using Various Diameters Depending on Flow Hydraulic Modelling Design of UG Tanks, Pumping Stations, Surface Reservoirs and Chlorination Tanks Preparation of Tender Documents Detailed Resident Supervision

50 Cusec Drainage of Wastewater / Effluent Channel from Mining Areas of Thar Coal Field

Location Thar Sector Public Health Total Cost PKR 6.6B Year 2022 Client Sindh Coal Authority Project Background The project includes Design and Construction Supervision of 50 Cusecs Drainage of Wastewater & Effluent Channel / Pipeline from Mining Area of Thar Coal Field Unit No. 2. In order to initiate open case mining activity in Thar, the need of highly efficient waste disposal system is considered necessary which is estimated to be 50 Cusecs. This waste water is required to be disposed off through transmission line. EA has taken up the task of designing an efficient, environment friendly and socio-economically viable effluent disposal system. Project Brief: GRP Pipe Line Length: 37 Km, Dia of GRP Pipe: 1200 mm, Stone Pitching: 7.7 Km x 5.0 m. Services EA’s scope of services included complete design and engineering solutions for bridge structure and infrastructure development. This covered feasibility analysis, structural design, geotechnical investigations, and construction supervision. Specialized expertise was applied in steel arch design, load testing, and quality assurance to ensure durability and safety. EA also coordinated with international consultants to align technical standards and project execution with global best practices. Topographic Survey Geotechnical Investigation Detailed Designing of Pipeline and allied works Structural Designing Design of Inlet & Outfall Chamber Preparation of contract documents Preparation of Evaluation Report Construction Management and Supervision

Aga Khan Hospital Storm Water Drainage

Location Karachi Sector Public Health Total Cost PKR 20M Year 2022 Client Aga Khan University Foundation Project Background This report comprised of study the levels of the catchments area, preparation of alternative proposals for storm water drainage and outfall, detail design of drainage channels, structures, culverts, outfalls, tender documents with drawings, specifications and bill of quantities, tender evaluation and award of works and top supervision. Services EA’s scope of services included complete design and engineering solutions for bridge structure and infrastructure development. This covered feasibility analysis, structural design, geotechnical investigations, and construction supervision. Specialized expertise was applied in steel arch design, load testing, and quality assurance to ensure durability and safety. EA also coordinated with international consultants to align technical standards and project execution with global best practices. Detailed Topographical Survey Detailed Design and Construction Drawings for the Storm Water Drainage system Preparation of Construction Documents Top Supervision