Lahore Dry Port

The Project’s first Phase is developed over 10 Acre of Site on a 30 Acre land space. The facility at Prem Nagar comprises 25,000 sq ft Cargo Shed, Admin Building, Container yard, Workshop with other required facilities of Dry port.

QICT Facilities

The QICT project comprises four components of works separately negotiated relating to the development for expansion of container terminal facilities at Bin Qasim and off dock terminal at Karachi. Planning and designing of container 5 high staking, heavy duty flexible pavements, RTG runner beams, operational buildings and construction of 6 meter high ruble bund in creek for the expansion of container terminal at Bin Qasim & setting up off Dock Terminal with related facilities. EA also provided the Security arrangements.

PIBT project

The Client (PIBT) intends to set up a dedicated bulk terminal at Port Qasim for the handling and storage of coal, cement and clinker. Master plan of the terminal was developed by Hamburg Port Authority. EA was assigned the project in collaboration with German design consultancy firm SELLHORN to develop the design of the project for the calling bids on EPC basis.

Ormara Naval Harbor

The study included design review/ vetting of proposed marine facilities for Pakistan Navy at Ormara

Off Dock Terminal at NLC

The off Dock Terminal has been planned on 9.6 acres land of NLC off M.T Khan Road, Karachi for M/s Qasim International Container Terminal. The work included the planning, design, flexible pavement 5 high loaded containers operational offices buildings, firefighting system, terminal lighting system comprising 30 meter high light masts etc.

KICT Container Terminal

Project comprises the expansion of existing KICT terminal (Phase III) on area of KPT Berth No.26 & 27 including design of Quay Wall structure for deep draft vessels, construction of Back up area for container terminal operation, development of existing KESC Power House area for the use of container terminal, relocation & modification in the existing administrative operations buildings; re-planning & designing power, electrification and fire- fighting systems.

Gizri Creek in DHA

The project comprises the Dredging in the Navigation Channel of Marina Club to keep it operative even in the lowest tidal conditions; Slope Protection by constructing a new Protection Wall from Marina club to Savor Restaurant; Making a cleaner Environment by removing the intoxicants/ pollutants from the Gizri Creek and Associated Back filling works.

Gwadar Water Front

The Project related to the Master Planning of Gwadar Waterfront from Gwadar west bay to Jiwani, a coastline of 150 Km. The Master Planning objective were the Socio – Economic uplift of the coastal settlements with provision of local facilities and infrastructure, creation of job opportunities and tourism development.