Baba Fareed Bridge

The Project involved the construction of a Bridge including Approach Road and training Works. The Project aims at providing an all-weather road link across river Sutlej between Pakpattan and Minchinabad to serve the adjoining areas. Feasibility Study was carried out by NHA in 1990 whereas study & design was updated in August 2005. . Bridge has 572 meters length, 13 Nos.span of 44m each. Carriageway width is 9 meter. Length of approach road is 8 km (4 km on each side of Bridge).