Improvement of Water Supply System of Defence Housing Authority( Phase – I to Phase –V) was developed as discrete incremental system without a master plan and water was not conveyed to all the consumers. This existing system was analyzed by actual exploratory digging and making the plan of existing network. This was then checked by Hardy Cross System and deficiencies were identified. The rehabilitation plan was prepared for improvement of the system.