Green Line Bus Rapid Transit System

Proposed route for Green Line starts from Municipal Park, Saddar to KESC Power House Chowrangi, Surjani. This busway will be constructed (dedicated for BRT vehicles) in the median of the roads along the corridor with stations in the center of the median in both at grade and elevated sections which all provide high speed (25 Km/h) and high capacity (29,400 passengers per hour per direction) service. The design capacity of the proposed BRT system with passing lanes provision will increase based on the number of direct / express services run between stations in the future, as required.

The main project objectives are to provide reliable, safe, affordable, high quality and fast BRT Bus Service; to improve the quality of life of commuters in Karachi; to vastly improve the quality of public transport system in Karachi; to provide infrastructure that allows buses to ply in an efficient manner with exclusive right-of-way for a significant portion of their route length and reduce travel time.