Interchange at Al Hamidiya Junction
Bridges & Interchanges
Location Ajman, UAE
Total Cost AED 16.00 Million
Year 2000
Lead Al Turath Engineering Consultants
Client Ministry of Public Works and Housing
- Preliminary Engineering Design to verify Concept Design.
- Detailed Engineering Design
- Complete computer based drafting and Bar bending schedule
- Preparation of BOQ and tender documents including technical specifications
- Top supervision of the Bridge Works.
The project comprises the Improvement and Upgrading of Al Hamidiya Junction & Design of Interchange Bridge. The approved proposal for the dual carriageway interchange bridges including post tensioned prestressed twin box girders of 54 meter span – one for each carriageway. Total deck width was 30 meters on each bridge, achieved by providing 2.5m cantilevers on either side of each box. The total height of the bridge from the finished road level to surrounding ground level was kept at approximately 9.6 meters to achieve a minimum vertical clearance of 6.0 meters.