Lahore-Islamabad Motorway
Bridges & Interchanges
Location Punjab Province, Pakistan
Total Cost PKR 25.20 Billion
Year 1997
Client National Highway Authority
- Supervision of earthworks for cut and fill.
- Supervision of mix design for asphalt and concrete..
- Supervision of Toll Plaza at Fatehjang Interchange
- Quality controls and testing of works.
- Supervision of pavements, bridges, culverts and retaining structures.
- Submission of monthly progress report
- Checking & verification of contractor’s bills.
The M-2 portion of Pakistan Motorway is approximately 340 km long. It starts near the village Kot Noor Shah at the junction of Lahore–Jaranwala road and the Lahore bypass. This portion of the Motorway terminates at Dhok Kala Khan village at the intersection of Shahrah-e-Kashmir and the G.T. (Grand Trunk) road near Islamabad. The construction of 95 km long Section-2 of M-2 extending from Pindi Bhattian to Bhera was supervised by EA. This section includes 20 bridges, 2 interchanges at Pindi Bhattian and Kot Momin, 39 underpasses and 15 major drainage structures.