Palm Jumeirah Tunnel
Bridges & Interchanges
Location Jumeirah, Dubai
Total Cost AED 400.00 Million
Year 2005
Lead Taisei Corporation
Services
- Design for stability of Coffer Dam.
- Seepage Analysis.
- Design of Sheet Piles
- Design vetting of the main tunnel boxes
The Tunnel connects mainland with the islands. It is a submerged tunnel 1.5 km long with Box section. EA investigated and checked the final design of temporary and permanent works for the above tunnel.