Sarai Gambila Karak Section
Roads & Highways
Location N.W.F.P, Pakistan
Total Cost PKR 1.055 Billion
Year 1998
Lead Pacific Consultants International
Client National Highway Authority
Services
- Detailed survey, technical investigations & design
- Quality controls of earthworks for embankment formation.
- Supervision for pavement construction.
- Identify the source of materials.
- Quality control of construction works.
- Monthly progress reports.
- Checking and verification of contractor’s bills
The project consisted of design and construction supervision of a 60 Km two lane new carriageway for realigned stretch of Indus Highway between Sarai Gambila & Karak. The project included 9 main bridges (2446 metres), 83 box culverts, several other drainage structures and a toll plaza.