Sarai Gambila Karak Section

The project consisted of design and construction supervision of a 60 Km two lane new carriageway for realigned stretch of Indus Highway between Sarai Gambila & Karak. The project included 9 main bridges (2446 metres), 83 box culverts, several other drainage structures and a toll plaza.