Al Khoud School

Al-Khoudh school is located in the coastal fishing town of north eastern Oman. The project has been divided into three phases. Phase one comprises day care center, phase two comprises of Lower and upper junior admin and phase three comprises senior school and sixth form. horities Technical Submission and NOC’s

Chiniot Anjuman Islamia Hospital

This is the project of Chiniot Anjuman-e-Islamia, a big NGO working for community betterment. The Hospital complex comprises a 350-bed facility for patients with full complement of medical services. Besides the hospital, hostels for doctor’s nurse’s and paramedical staff have also been provided.

Khairpur Special Economic Zone

District Government Khairpur planned to establish a Special Economic Zone to capitalize the dates producing areas of Khairpur. 164 acres of land was identified in Theri Town, located along the National Highway at the location between date producing area of Khairpur and Sukkur.

Kotli Sports Stadium

The Kotli Sports Stadium is located on Rawalpindi-Kotli Road, comprising the Cricket Stadium, Badminton Court, Store for Ground Equipments, Offices, Billiard & Table Tennis Hall, Disable Room, Kids Play Area, Marriage Hall with Kitchen, Restaurants, 7 Lane Running Track, Football Field & Hockey Fields. This stadium provides most modern facilities for national and international media coverage of the matches through its media center. The Main Pavilion provides facilities like Cafeteria and related services at the ground floor and Player lounges, VVIP seating and related services at the first floor. The media center also has a dormitory for the players at the ground floor. The capacity of Stadium is for 10,000 persons.

Sheikh Zayed Airport

The existing Runway pavement sections / thickness for Boeing 747-400 and Airbus operations are considered structurally inadequate and need further investigation and strengthening with an adequate overlay. The Department of His Highness Sheikh Khalifa Bin Zayed Al-Nahyan has desired to upgrade the existing Runway and Apron for his highness’ visit to Rahim Yar Khan. With this in view a reconsideration of existing runway, taxiway and apron pavements have been made and appropriate provisions have been proposed for consideration and provision of operational facilities for operating B-747-400 Domestic Aircraft.

Gwadar Sports Complex

The project comprises Gymnasium, Squash Court (2 Nos.), Field & Pavilion, Basket Ball Court, Volley Ball Court, Swimming Pool (2 Nos.), Club House with Residential Rooms, Foot Ball Stadium for 10,000 spectators, Hockey Stadium for 5,000 spectators and Cricket Stadium for 10,000 spectators.

Indus Highway Phase I, II & III

Indus Highway Phase I & II comprises the Rehabilitation of 58 km Kotri- Manjhand section in Sindh and 36 km Karak- Karappa section in NWFP. The last phase of the construction connects the three provinces of Sindh, Punjab and the Frontier. Due to the difficulties faced in the rehabilitation of the existing Phase-I and Phase-II roads, it was decided that 450 km Phase-III roads would be constructed on totally new alignment. The alignment passes through the cities of Rajanpur, Dera Ghazi Khan in Punjab and Dera Ismail Khan in N.W.F.P.

This Project (Phase I, II & III) includes design of 70 main Bridges, 20 Overhead Bridges, several drainage structures including 50 box culverts, some overpasses across the railway track and a toll plaza.

CDM Warehouse

The Central Warehouse is a state-of-the-art supply and distribution facility for Family Planning Commodities, funded by USAID. This Project comprises Warehouse (Pre Engineered Structure), administration offices with allied facilities, cold storage, external infra-structure, sewerage / water supply, drive ways, vehicles parking sheds, paths, storm water drainage, boundary wall, external landscaping and renovation of existing warehouse.

D. I. Khan-Mughal Kot section

The project work consists of rehabilitation and improvement of D.I.Khan to Mughal Kot Road (125 km) section of National Highway (N-50) between D.I.Khan to Zhob, passing through D.I.Khan district and FATA, at a foot of Kohe-Suleman Range. It is an inter province link between NWFP` and Balochistan. Since D.I.Khan to D.G.Khan is flood prove area, therefore this route will also provide an alternative link between NWFP and Karachi during the flood period. This Project includes 11 Bridges & 323 Culverts.

The existing road is a single lane and shall be improved into a proper two-lane carriageway. The road shall play the significant role in the future development of the area.

Bawany Sugar Mills

The mill includes complete unit for sugarcane crushing, processing and refining plant for a gross production of 1.3 million tons of white sugar and 0.72 million tons of molasses along with 47 megawatt power plant operate able through bagaas; residential colony for O&M staff and labor colony for over 450 persons. Major portion of crushing area, main plant and the generating house comprises steel structure and includes Steel Trusses and Gable Frames on isolated Foundations and single Pile Foundation while office block, residential and labor colony was constructed based on RCC structure.