Ufone Towers

The project comprises the Development of R & D Facility for Ufone.

Quetta Water Supply Project

The project is based on Technical Assistance Program of Asian Development Bank aimed at preparation of a project for Bank Financing for development of Water Resources of Quetta City, comprising development of available water sources and water distribution network, water quality control and for improvement of environment including upgrading of sewerage, drainage and solid waste disposal facilities for Quetta City.

Pipeline from Sawaliguarm to Pasni

This project comprises laying of pipe line from channel 3 to Pasni Town. The project is proposed to be financed under Omani grant. The project is divided into two phases.

In phase 1, the scope of work includes design and supervision of 450mm dia pipeline from existing water works up to the city water works, which covers 10 km of length.

Phase 2 involved designing of water transmission main and sedimentation tank. The length of transmission main is 19 km. The source of water supply will be channel 3 which is originating from Shadi kaur Dam. The 500 mm dia transmission line will transport the water to sedimentation tank which is proposed near Zero Point Turbat Road. The sedimentation tank is designed for 1 day storage and 5 hours retention having the size of 110m x 36m x 2.7m. The transmission line from sedimentation tank will then be connected to the transmission line phase 1.

Nathiagali Sewerage Project

The project consisted the planning and design of sewerage and drainage scheme for the famous hill resort of Nathiagali in the province of North West Frontier. The work involved extensive topographic survey, identification of sewage disposal points and design the whole sewerage and drainage system.

PPL House

PPL proposed to have a new head office building ‘PPL House’ at 6,928 sq.yds plot at Civil Lines Quarters, Dr. Ziauddin Ahmed Road, Karachi. The design conceives a 22 story building with services space on top. The height from the natural ground level is 296 feet. It was designed to be the first LEED accredited green building.

Haripur Sewerage Scheme

This was a feasibility study comprising study of existing services of water supply, sewerage and drainage systems, carryout the hydraulic and structural design of sanitary sewers and storm water drainage systems, determine the environmental impact of the proposed system, preparation of design, drawings, cost estimates, feasibility study report & PC-I and final design report.

Karachi Bulk Water Supply Scheme

65 MGD Bulk Water Supply under Greater Karachi Bulk Water Supply Scheme (Phase – IV, Stage- II ) comprises design & construction supervision of Dhabeji Pumping Station for 5 pumps of 25 MGD each and a standby diesel generating set of 4 MW, a chamber with transition at tunnel end, Laying of PRCC Transmission Main of various dia from tunnel end at pipri to NEK Pumping Station, at NEK Pumping Station, at COD Hills and from Kidney Hill Reservoir to Society areas, Pumping Station at Dumlottee and additional works at NEK Pumping Station, rehabilitation of COD & Kidney Hill Pumping Stations, Bypass connections & interconnections.

Athmuqam Hospital

The 220-Bed Hospital including Doctors & Nurses residences, comprises different wards, Emergency, Radiology & Labs, Operation Theaters, Intensive Care unit (ICU), Coronary Care Unit (CCU), Staff Hostels and ancillary facilities etc. along with all necessary E&M works, related infrastructure and landscaping.

The Arkadians

The Arkadians- Creek View & Creek Terraces comprises 13 residential towers, six office enclaves and utility spaces. The Arkadians will provide a perfect blend of luxurious and world-class lifestyle, modern design and peaceful living that is ideal for both living and doing business in one of Karachi’s most desired neighborhoods. Intimidating the open skies with sheer heights, the majestic towers loom over the financial hub’s most coveted neighborhood and span voluptuously over an area of about 43 acres – a royal dream in the making. EA has been awarded three Towers (26-36 stories)

Hyderabad Sewerage Scheme

Master Plan of Greater Hyderabad Sewerage Project (phase 1) was prepared by Hyderabad Development Authority through their Consultants M/s. D. Balfour and Sons in 1984. This Master Plan was divided into different Phases. The Executive Committee of the National Economic Council approved PC-I of Phase-I. This Phase-I of the Project provides for rehabilitation of the existing sewerage system and laying of comprehensive Sewerage System in Latifabad and Pretabad, extension of Northern Sewage Treatment Work and Construction of additional Sewage Treatment Plant for the existing and new development in the Western areas of Hyderabad City.