Nawab Akbar Bugti Stadium

In addition to Main Pavilion, this stadium provides most modern facilities for national and international media coverage of the cricket matches through its media center. The Main Pavilion provides facilities like Cafeteria and related services at the ground floor and Player lounges, VVIP seating and related services at the first floor. The media center also has a dormitory for the players at the ground floor. The seating for the general public is provided in the form of open tiers in a circular shape around the playing field.

Baberlo-Ghotki Section

The Additional Carriageway Baberlo-Ghotki Section, National Highway N-5 (Contract GOP-3) covers approximately 59 kms in length and runs parallel to the existing N-5 [National Highway]. This section passes through some difficult terrain like heavy rock cuts and water logged areas. The project starts at a junction after Baberlo town from where a road going towards west leads to Sukkur city over a Sukkur barrage on river Indus and terminates at approximately 4.5 kms before Ghotki city. It includes 2 bypasses, 10 canal bridges, 1 overhead bridge, 1 underpass, 70 box and 68 pipe culverts. The road consists of 7.3 m carriageway with 3m and 1.5m double surface dressed shoulders. The bypasses are located at Rohri and Pano Aqil town.

Balakot – Naran section

The project is a rehabilitation of National Highway N-15, Basian-Balakot-Naran Section, one of the badly damaged four major roads by the earthquake of October 2005, has been undertaken by NHA under contract -16, 65 km, with financial assistance from the World Bank. The first phase starts from km 37+600 and ends at km 81+600 (Balakot to Mahandri 44 km length). The road lies to the east of the river “Kunhar” in a steep side valley. The damage is extensive and comprises slips, slides and longitudinal and transverse cracks. The rehabilitation stategy includes widening the vROW from 13 m to 20 m improving the alignment reconstruction of retaining wall, breast wall and reconstruction of Bridges, Culverts and Causeways.

Interchange at Al Hamidiya Junction

The project comprises the Improvement and Upgrading of Al Hamidiya Junction & Design of Interchange Bridge. The approved proposal for the dual carriageway interchange bridges including post tensioned prestressed twin box girders of 54 meter span – one for each carriageway. Total deck width was 30 meters on each bridge, achieved by providing 2.5m cantilevers on either side of each box. The total height of the bridge from the finished road level to surrounding ground level was kept at approximately 9.6 meters to achieve a minimum vertical clearance of 6.0 meters.

Embassy of Afghanistan

The Project comprises Administration Building including Conference Room, Multipurpose Hall for 500 People adjustable for ceremonies & dining and Parking for 53 VIP Cars, Ambassador’s Residence, Residential Apartments for Diplomats, Consulate Section and Sports Area in Ambassador’s Resident, Residential Area for Diplomats & in Consulate section.

BF Tower

The Project for the Federal Employees Benevolent & Group Insurance Funds is located in Blue Area (Jinnah Avenue) Islamabad. The BF Tower has been planned for construction as a mixed-use, multi-story commercial building and is designed to accommodate commercial retail, office floors, health club, food court and a 4 screen Cineplex with a roof top restaurant. The building has 6 basements for car parking, and Ground plus 22 storeys achieving a total height of 100 meters. The tower has building integrated photo voltaics on the curtain wall cladding and will be an energy efficient building with a reduced carbon footprint.

Baba Fareed Bridge

The Project involved the construction of a Bridge including Approach Road and training Works. The Project aims at providing an all-weather road link across river Sutlej between Pakpattan and Minchinabad to serve the adjoining areas. Feasibility Study was carried out by NHA in 1990 whereas study & design was updated in August 2005. . Bridge has 572 meters length, 13 Nos.span of 44m each. Carriageway width is 9 meter. Length of approach road is 8 km (4 km on each side of Bridge).

Jumeirah Beach Residence

The project (Sector-3) located at Jumeirah Beach (Dubai) on Sheikh Zayed Road, is one of the most favourite tourist attraction, with land mark properties as Sheraton Jumeirah Beach and Burj Al Arab hotels. The Sector-3, biggest of all the seven sectors, consists of 7 towers and a common Podium. The 4-level Podium consists of a semi-basement level covering the entire site utilized for car parking, loading and unloading bays, building services and access to upper floors. The ground and two levels above are assigned to the commercial, recreational and entertainment areas with car parking. The gross area of the Podium is about 140,000 square meters. The 7 residential towers (17 to 53 levels) having gross area of about 217,500 square meters.

Gwadar Water Front

The Project related to the Master Planning of Gwadar Waterfront from Gwadar west bay to Jiwani, a coastline of 150 Km. The Master Planning objective were the Socio – Economic uplift of the coastal settlements with provision of local facilities and infrastructure, creation of job opportunities and tourism development.

WWF Hospital

The 500-Bed Teaching Hospital & Dental College shall provide comprehensive health care (specialist and referral services) to the community and shall maintain an acceptable standard of quality healthcare when completed. The Project comprises various departments viz Medical & Surgical with Allied Specialties, Anesthesia, Radiology, Pediatrics & Allied Specialties, Psychiatry, Eye & ENT with Allied facilities, Gynecology & Obstetrics, Dentistry, Emergency, Diagnostic & Laboratory Facilities, Physiotherapy, Teaching and Research Facilities & Administrative and Support Departments along with OPD, Wards, Doctor Area with ancillary facilities and Staff Residences.